Please use a modern browser. This website is not designed for versions of Internet Explorer below IE10
masthead
masthead
masthead
masthead
menu
Terminal News

DJ South Gathering to expand Colorado pipeline

DJ South Gathering to expand Colorado pipeline
DJ South Gathering will expand its fast-growing crude oil gathering and transportation system in the prolific DJ Basin in northeastern Colorado.

DJS' Platteville Complex now has connectivity to Tallgrass Energy, LP's Pony Express Pipeline and terminal system. With an initial throughput of 48,000 barrels per day, the connection into Tallgrass' Grasslands terminal continues ARB Midstream's mission to operate the most connected crude pipeline system and offer shippers the widest market access in the DJ Basin.

ARB's link to Tallgrass' Pony Express system will be fed by ARB's 300,000 barrels of dedicated crude oil storage at Platteville, which is in turn fed by DJS' 90,000 b/d Badger segment, 220,000 b/d Matador pipeline and the 150,000 b/d bi-directional Freedom pipeline, linking Platteville to Lucerne West.

ARB's crude oil gathering systems include over 250 miles of new pipeline covering the core of the DJ Basin, with over 625,000 b/d of planned and existing throughput capacity and 600,000 barrels of storage.

The continued expansion of the ARB Midstream pipeline system in the DJ Basin is funded by Ball Ventures through its energy division: BV Natural Resources.



Share: