The 5th annual programme “Terminal Management. Logistics for Traders” will feature the onsite visits to Botlek Tank Terminal, Odfjell Terminal Rotterdam, Vopak Rotterdam, Oiltanking Terneuzen, and Zenith Energy Amsterdam Terminal, as well as the detailed insights on terminals’ modernisation plans.
- Botlek Tank Terminal: Phase-II expansion works – expanding its current capacity from 200,000 to 750,000 cubic metres, construction of new fourteen storage tanks and three quays for inland vessels;
- Vesta Terminals: Potential expansion total for up to 830,000 cubic metres. Construction of 56 new tanks at all three terminals and 2 quays at Vesta Terminal Flushing
- Rubis Botlek Terminal 2 Construction: Expansion Rubis Terminal (RT2). The first phase of construction completed in January 2017 and in the coming year there will Phase 2 be started. The terminal will increase its capacity from the current 197 000 m3 to 311 000 m3.
- Port La Nouvelle expansion: Port authorities have planned a deep sea port expansion to accommodate larger ocean-going-vessels up to 14.50m draft (dredging at minus 16 m), corresponding to ships of about 80,000 dwt for dry bulk, even more for liquid bulk.